Commercial Office Case Study

Dallas Downtown Office Tower

Premium exterior renovation of a 50-story Class A office building in the heart of downtown Dallas, featuring energy-efficient coatings and comprehensive restoration.

Dallas, Texas
12 Week Project
50 Stories

Project Overview

This iconic 50-story office tower in downtown Dallas required a complete exterior renovation to restore its prestigious appearance and improve energy efficiency. The building houses Fortune 500 companies and premium professional services firms.

Our team executed a comprehensive exterior painting and coating project that not only transformed the building's appearance but also incorporated advanced heat-reflective technology to significantly reduce energy costs in the Texas heat.

450,000 sq ft
area
12 weeks
timeline
35 professionals
crew
$1.8 million
budget
50 stories
floors
Dallas office building before renovation
Dallas office building after painting transformation

Challenges & Solutions

High-rise commercial buildings in urban environments present unique challenges that require specialized expertise and innovative solutions.

Key Challenges

  • Working at extreme heights in downtown Dallas wind conditions
  • Maintaining professional appearance during business hours
  • Coordinating with multiple tenant companies
  • Strict city permit and safety requirements
  • Weather-damaged surfaces requiring extensive preparation

Our Solutions

  • Advanced swing stage and safety equipment systems
  • Night and weekend work schedules for minimal disruption
  • Dedicated tenant communication coordinator
  • Full compliance team for permits and inspections
  • Comprehensive surface restoration before coating application

Technical Specifications

Premium materials and advanced application techniques for lasting results.

Exterior Coatings

  • • Elastomeric waterproof coating
  • • UV-resistant topcoat
  • • Heat-reflective technology
  • • 15-year warranty system

Surface Preparation

  • • High-pressure washing
  • • Crack repair and sealing
  • • Rust treatment
  • • Premium primer application

Safety Systems

  • • Advanced swing stage systems
  • • Wind monitoring equipment
  • • Safety netting installation
  • • 24/7 security coordination

Project Results & Impact

Measurable improvements in property value, energy efficiency, and tenant satisfaction.

5%
increase in property value ($4.2 million)
20%
reduction in cooling costs with heat-reflective coatings
100%
tenant satisfaction rating
Zero
safety incidents throughout project
15-year
warranty on all exterior surfaces

Client Testimonial

"Moorhouse Coating delivered exceptional results on our flagship Dallas property. The heat-reflective coating technology has dramatically reduced our energy costs, and the building looks absolutely stunning. Their team's professionalism and attention to safety while working at extreme heights was impressive. We've already engaged them for our other properties."
RJ
Robert Johnson
VP of Facilities, Skyline Property Management

Project Gallery

Visual documentation of the transformation process.

Detailed view of exterior coating application

Precision coating application

Safety equipment and team at work

Advanced safety systems in action

Finished building gleaming in sunlight

Stunning final results

Related Case Studies

Explore more commercial office building transformations.

Before
Austin Tech Tower
After
Austin Tech Tower

Austin Tech Tower

Commercial Office Austin, TX 8 weeks 350,000 sq ft

Client

Austin Technology Partners

Challenge

Modern tech campus requiring vibrant, creative design

Solution

Custom color schemes with brand integration

Results

  • Enhanced corporate identity
  • Improved employee satisfaction
  • LEED Gold certification
Before
Houston Energy Plaza
After
Houston Energy Plaza

Houston Energy Plaza

Corporate Headquarters Houston, TX 10 weeks 600,000 sq ft

Client

Energy Corporation of Texas

Challenge

Oil & gas headquarters needing weather-resistant coating

Solution

Hurricane-rated coating systems with 20-year warranty

Results

  • Withstood Category 3 hurricane
  • 30% maintenance reduction
  • Energy Star certified
Before
Phoenix Financial Center
After
Phoenix Financial Center

Phoenix Financial Center

Financial Services Phoenix, AZ 6 weeks 280,000 sq ft

Client

Southwest Financial Group

Challenge

Extreme heat exposure requiring specialized coatings

Solution

Advanced heat-reflective system with ceramic technology

Results

  • 25% cooling cost reduction
  • Surface temperature reduced 40°F
  • 10-year performance guarantee

Transform Your Commercial Property

Let us help you increase property value, reduce energy costs, and create a lasting impression with professional commercial painting services.