Project Overview

A major aerospace manufacturer in Seattle needed to update their 180,000 square foot production facility while maintaining continuous aircraft component manufacturing operations. The project required specialized cleanroom painting protocols and coordination with precision manufacturing schedules.

This project presented unique challenges: maintaining FAA-compliant cleanroom standards during painting, coordinating around $2 billion in active aircraft orders, and applying specialized coatings that could withstand the Pacific Northwest's marine climate while meeting aerospace industry specifications.

Key Success Metrics

Timeline: Completed on schedule despite weather

Production Impact: Zero manufacturing delays

Quality: FAA inspection passed first time

Environmental: Zero contamination incidents

Project Details

Location

Seattle, Washington

Facility Size

180,000 square feet

Timeline

8 weeks (weather-adjusted schedule)

Project Value

$320,000

Industry

Aerospace Manufacturing

The Challenge

Manufacturing Constraints

  • Active aircraft component production worth $2 billion in orders
  • FAA-mandated cleanroom standards throughout facility
  • Precision manufacturing tolerances requiring contamination-free environment
  • Seattle's challenging weather conditions during project timeline

Technical Requirements

  • Anti-static floor coatings for sensitive electronic components
  • Chemical-resistant surfaces for cleaning protocols
  • Seamless finishes preventing particle accumulation
  • Marine-grade exterior coatings for Puget Sound climate

Our Aerospace Solution

Cleanroom Protocol Implementation

Deployed FAA-compliant cleanroom procedures including HEPA filtration, positive pressure containment, and continuous particle monitoring throughout the painting process.

  • • ISO Class 8 cleanroom standards maintained
  • • HEPA-filtered spray equipment
  • • Real-time contamination monitoring
  • • Certified cleanroom technicians

Precision Scheduling Coordination

Worked in 12-hour shifts during planned maintenance windows, coordinating with production schedules to ensure zero impact on aircraft component manufacturing.

  • • Night shift operations (7 PM - 7 AM)
  • • Real-time coordination with production managers
  • • Weather-adjusted scheduling for exterior work
  • • Rapid equipment mobilization

Outstanding Results

8 weeks

Completed on schedule

0 days

Production delays

100%

FAA compliance rate

$2B

Orders protected

Technical Coating Systems Applied

Production Floor Areas

  • System: Anti-static epoxy floor coating
  • Coverage: 120,000 sq ft
  • Performance: Static dissipative, chemical resistant
  • Compliance: FAA cleanroom standards

Cleanroom Wall Systems

  • System: Non-outgassing acrylic finish
  • Coverage: 85,000 sq ft
  • Performance: Seamless, easy-clean surface
  • Features: Antimicrobial, low-particle shedding
"Moorhouse Coating understood the critical nature of our aerospace manufacturing environment. Their cleanroom protocols were flawless, and they completed the project without a single production delay. The coating systems have performed excellently in our demanding Pacific Northwest climate. This is exactly the kind of partner we need for our facility maintenance."

David Kim

Facilities Operations Manager

Major Aerospace Manufacturer

Need Aerospace Facility Painting?

Discover how our specialized aerospace painting services can support your manufacturing operations