Project Overview

This Walmart Supercenter in Dallas, Texas serves over 5,000 customers daily and operates 24 hours a day, 7 days a week. The facility required a comprehensive interior and exterior refresh as part of Walmart's nationwide store modernization initiative while maintaining continuous operations without any revenue loss.

Our team was selected for this high-profile retail renovation based on our proven expertise in retail store painting with minimal business disruption. The project demanded precise coordination with store management, overnight stocking crews, and department managers to ensure seamless execution.

Working exclusively during overnight hours from 10 PM to 6 AM, our specialized retail crews completed 180,000 square feet of painting and epoxy floor coatings in just 3 weeks. The store opened for business each morning with zero evidence of construction activity—a testament to our operational excellence and commitment to customer experience.

Challenges & Solutions

Challenges

  • Maintaining 24/7 store operations serving 5,000+ customers daily during renovation
  • Coordinating work around continuous grocery stocking and overnight inventory operations
  • Managing odor-free environment for fresh food departments and customer areas
  • Working around existing fixtures, shelving, and merchandise displays without damage
  • Meeting strict Walmart brand standards and department-specific color schemes
  • Completing project within aggressive 3-week deadline during holiday season prep
  • Ensuring safety compliance with customers and staff in active work zones
  • Protecting high-traffic floor areas requiring specialized epoxy coating systems

Solutions

  • 100% night shift work schedule from 10 PM to 6 AM with complete daily cleanup
  • Close coordination with store management and overnight stocking teams for zone access
  • Zero-VOC and low-odor paint systems safe for food service environments
  • Detailed protection protocols for all fixtures, merchandise, and customer touchpoints
  • Professional color matching to Walmart's corporate brand guidelines
  • Multi-crew deployment with specialized teams for different departments and tasks
  • Comprehensive safety barriers and signage systems during active work periods
  • Fast-cure epoxy systems for high-traffic entrances and checkout areas

Technical Specifications

Sherwin-Williams ProMar 200 Zero VOC interior latex for main areas
Specialty anti-microbial coatings for food service and restroom areas
High-durability epoxy floor coatings rated for 500+ daily foot traffic
Custom color matching for 12 distinct department zones
Moisture-resistant coatings for produce and refrigerated departments
Graffiti-resistant exterior coatings for loading dock and storage areas
ADA-compliant slip-resistant floor coating systems
Extended warranty protection for all coating applications

3-Week Execution Timeline

Phase 1: Week 1

7 nights

Back-of-House Areas & Preparation (Nights 1-7)

  • Storage rooms, receiving areas, and employee break rooms completed first
  • Established workflow patterns with minimal customer-facing disruption
  • Epoxy floor coating installation in receiving dock and storage zones
  • Team coordination protocols finalized with store management

Phase 2: Week 2

7 nights

Sales Floor Departments & High-Traffic Zones (Nights 8-14)

  • Systematic department-by-department painting during overnight hours
  • Grocery, electronics, apparel, and home goods sections completed
  • Fast-cure epoxy installation at main entrance and checkout zones
  • Daily quality control inspections before 6 AM store opening

Phase 3: Week 3

7 nights

Final Details & Exterior Touch-ups (Nights 15-21)

  • Customer service areas, pharmacy, and specialty departments finished
  • Exterior entrance refresh and signage area painting completed
  • Final walkthrough and touch-up work throughout entire facility
  • Project completed 2 days ahead of schedule with zero punch list items

Retail Operations Coordination

Maintaining seamless 24/7 retail operations required detailed coordination and flexible scheduling to work around customer traffic, inventory management, and store activities.

Store Hours Management

Coordinated all work during 10 PM - 6 AM window with complete area restoration before opening. Implemented containment systems allowing customers to shop normally during day shifts.

Inventory & Stocking Coordination

Worked around overnight stocking crews with detailed zone scheduling. Maintained access corridors for inventory flow while painting adjacent areas.

Safety & Customer Protection

Used professional barriers and clear signage during work hours. All equipment removed and areas cleaned before store opening with zero customer disruptions.

Department Manager Communication

Daily briefings with department managers on schedule and progress. Flexible approach allowed immediate adjustments for special events or promotional displays.

"Moorhouse Coating transformed our entire Supercenter in just three weeks without disrupting a single day of business. Their overnight crews were professional, efficient, and meticulous about cleanup. We never received a customer complaint, and the store looks absolutely fantastic. The project finished ahead of schedule, which was critical for our holiday season preparation. We've already contracted them for our other Dallas-area locations."
Michael Rodriguez
Regional Facilities Manager
Walmart Stores, Inc.

Results & Impact Metrics

180K
Square Feet Painted
100%
On-Time Completion
0
Customer Complaints
3
Weeks Duration
35
Crew Members
0
Safety Incidents
2
Days Ahead of Schedule
$0
Lost Revenue

Project Impact

The Walmart Supercenter renovation delivered exceptional results that exceeded client expectations while maintaining continuous business operations. The comprehensive transformation improved the shopping environment, enhanced brand consistency, and positioned the store for increased customer satisfaction.

Operational Excellence

  • Completed 2 days ahead of schedule
  • Zero customer complaints throughout project
  • 100% Walmart brand standard compliance
  • Zero safety incidents or violations

Business Benefits

  • No lost revenue during renovation period
  • Enhanced customer shopping experience
  • Improved employee morale and satisfaction
  • 10-year warranty on all coating systems

Related Case Studies

Retail Store Renovation - National Retail Chain
National Retail Chain

Retail Store Renovation

Multi-location retail painting program with consistent brand standards.

Multiple Locations
Ongoing
National Retail Chain 50 Stores - Major Retailer
Major Retailer

National Retail Chain 50 Stores

Large-scale retail renovation program across 50 store locations.

50 Stores
6 months
Amazon Distribution Center - Amazon
Amazon

Amazon Distribution Center

Warehouse and distribution facility coating with rapid turnaround.

1.2M sq ft
8 weeks

Ready to Transform Your Retail Space?

Get a free consultation and project estimate from our retail painting experts.