High-Rise Restoration Project

Wells Fargo Tower

Complete exterior restoration of a 52-story downtown landmark featuring advanced coating systems, specialized access solutions, and zero operational disruption.

Downtown Phoenix
52 Floors / 750 ft
LEED Gold Certified

Project Overview

The Wells Fargo Tower stands as one of downtown Phoenix's most iconic structures. This comprehensive exterior restoration project required exceptional expertise in high-rise coating application, specialized access systems, and meticulous project management to transform the building while maintaining full operations.

Our team applied cutting-edge coating systems designed specifically for high-rise applications, providing superior weather resistance, energy efficiency, and aesthetic enhancement. The project achieved LEED Gold certification standards while delivering significant energy savings and extending the building's facade lifecycle by decades.

52 Floors
height
1.2M sq ft
area
6 Months
timeline
35 Specialists
crew
$2.8M/year
Energy Savings
Wells Fargo Tower full building view

High-Rise Coating Expertise

Specialized techniques and equipment for working at extreme heights with zero compromise on safety.

Swing Stage Systems

Advanced suspended scaffolding with redundant safety systems

Safety Protocols

OSHA-certified crews with specialized high-rise training

Weather Monitoring

Real-time wind speed and weather condition tracking

Coordination

Seamless integration with building operations and tenants

Specialized Access Solutions

Primary Access Systems

  • Twin-motor swing stages with backup power systems
  • Bosun's chairs for detailed architectural features
  • Articulating boom lifts for lower level access
  • Rope access technicians for complex areas

Safety Features

  • Independent lifelines and fall arrest systems
  • Daily equipment inspections and certifications
  • Wind speed limits and automatic shutdown protocols
  • Ground-level exclusion zones and protective canopies

Challenges & Solutions

High-rise projects in downtown environments require innovative solutions to unique challenges.

Key Challenges

  • Working at extreme heights up to 750 feet
  • Downtown location with heavy pedestrian traffic
  • Strict noise and work hour restrictions
  • Weather delays and wind speed limitations
  • Maintaining building operations during work
  • Complex architectural details and window systems

Our Solutions

  • Advanced swing stage and suspended scaffold systems
  • Comprehensive pedestrian protection and wayfinding
  • Silent equipment and strict schedule compliance
  • Real-time weather monitoring and flexible scheduling
  • Phased approach with minimal tenant impact
  • Custom application techniques for detailed work

Sustainability & LEED Certification

Contributing to LEED Gold certification through energy-efficient coating systems and sustainable practices.

1

LEED Gold certification contribution

2

30% reduction in building energy consumption

3

Solar heat gain coefficient improvement

4

Low-VOC and environmentally friendly coatings

5

20-year lifecycle reducing repainting frequency

6

Reflective coatings reducing urban heat island effect

Energy Performance Impact

30%

Energy Reduction

45°F

Surface Temp Reduction

850

Tons CO2 Saved/Year

$2.8M

Annual Savings

Phased Project Execution

Strategic phasing ensured continuous building operations with minimal tenant disruption.

Phase 1: Preparation

Months 1-2

Equipment setup, access system installation, surface assessment

Phase 2: Upper Floors

Months 2-3

Floors 40-52, executive levels, minimal noise requirements

Phase 3: Mid-Level

Months 3-5

Floors 20-39, primary office spaces, weekend work options

Phase 4: Lower Levels & Podium

Months 5-6

Floors 1-19, retail podium, public areas, pedestrian management

Project Results & Impact

Exceptional outcomes demonstrating the value of professional high-rise coating expertise.

100%
On-Time Completion
Zero
Safety Incidents
LEED Gold
Certification Achieved
20 Years
Warranty Coverage
Moorhouse Coating transformed our building with remarkable professionalism and expertise. Their high-rise specialists managed every aspect flawlessly - from the complex access systems to the LEED certification requirements. The energy savings alone justify the investment, but the enhanced appearance and extended building lifecycle make this one of our best capital improvements. Their safety record and minimal disruption to our tenants were exceptional. We couldn't be more pleased with the results.
MK
Michael Kraemer
Director of Facilities, Wells Fargo Tower Management
Wells Fargo Tower before restoration

Before: Faded and weathered exterior

Wells Fargo Tower after restoration

After: Vibrant, energy-efficient coating

Related High-Rise Projects

Explore more of our high-rise and commercial tower restoration projects.

Before
Chase Tower Phoenix
After
Chase Tower Phoenix

Chase Tower Phoenix

40-Story Tower Phoenix, AZ 5 months 950,000 sq ft

Client

JPMorgan Chase

Challenge

Downtown high-rise with complex architectural features

Solution

Specialized coating system with metallic accents

Results

  • 25% energy savings
  • LEED Silver certified
  • Zero downtime
Before
Bank of America Plaza
After
Bank of America Plaza

Bank of America Plaza

55-Story Tower Los Angeles, CA 7 months 1.4M sq ft

Client

Bank of America

Challenge

Seismic zone requirements and coastal exposure

Solution

Elastomeric coating system with salt resistance

Results

  • Seismic compliance
  • 30-year warranty
  • 35% energy reduction
Before
Transamerica Pyramid
After
Transamerica Pyramid

Transamerica Pyramid

48-Story Pyramid San Francisco, CA 8 months 850,000 sq ft

Client

Transamerica Corporation

Challenge

Iconic architecture requiring precision work

Solution

Custom color matching and specialized access

Results

  • Preserved iconic appearance
  • Improved efficiency
  • Landmark approval

Ready for Your High-Rise Project?

Trust Moorhouse Coating for your high-rise coating needs. Our specialized expertise, advanced equipment, and proven safety record ensure exceptional results for towers of any height.