Bank of America Plaza
Premier 55-Story Office Tower Exterior Restoration
Downtown Los Angeles flagship property receives comprehensive exterior coating restoration featuring advanced high-rise access systems and premium weatherproofing technology.
Project Overview
The Bank of America Plaza stands as one of downtown Los Angeles' most recognizable landmarks. This 55-story Class A office tower required a comprehensive exterior restoration to maintain its prestigious appearance and protect against weathering from coastal conditions.
Our team was selected for this high-profile project based on our extensive experience with high-rise buildings and proven track record in downtown Los Angeles. The project demanded meticulous planning, advanced access systems, and coordination with building operations to minimize disruption to the building's prominent tenants.
Working at heights up to 800 feet above street level, our specialized crews employed swing stage systems and comprehensive safety protocols to deliver exceptional results on schedule. The project was completed in seven months with zero safety incidents and zero tenant complaints—a testament to our professionalism and operational excellence.
Challenges & Solutions
Challenges
- • Working at extreme heights up to 800 feet above street level
- • High-traffic downtown Los Angeles location with strict safety protocols
- • Limited work hours due to building operations and noise restrictions
- • Coastal weather conditions and marine layer affecting application
- • Maintaining pristine appearance for Class A office tenants
- • Coordinating with property management and multiple tenant schedules
Solutions
- ✓ Advanced swing stage systems with redundant safety measures
- ✓ Comprehensive street-level protection and pedestrian management
- ✓ Night and weekend work schedule minimizing business disruption
- ✓ Weather monitoring system with application window optimization
- ✓ Phased execution plan coordinating with building operations
- ✓ Premium coating systems with superior adhesion and durability
Technical Specifications
Phased Execution
Phase 1
8 weeksSite Setup & South Façade (Floors 1-20)
- ▸ Swing stage installation and safety certification
- ▸ Street-level protection systems deployed
- ▸ Lower-level coating application with minimal disruption
Phase 2
10 weeksMid-Tower & East/West Façades (Floors 21-40)
- ▸ Simultaneous multi-façade operations
- ▸ Advanced weather monitoring protocols implemented
- ▸ Zero tenant complaints regarding noise or disruption
Phase 3
8 weeksUpper Tower & North Façade (Floors 41-55)
- ▸ High-altitude specialized crew deployment
- ▸ Architectural detail restoration at crown
- ▸ Final inspection and quality assurance completion
"Moorhouse Coating delivered exceptional results on our flagship property. Their professionalism, safety standards, and attention to detail throughout the 7-month project exceeded our expectations. The building looks stunning, and we received zero tenant complaints despite the complex work. We've already engaged them for our other downtown properties."
Results & Impact
The Bank of America Plaza exterior restoration was completed on schedule and within budget, delivering exceptional results that exceeded client expectations. The building's renewed appearance enhances its market position as a premier downtown Los Angeles office tower.
Related Services
Office Building Painting
Professional painting services for office buildings and commercial properties.
High-Rise Exterior Painting
Specialized high-rise exterior coating and restoration services.
Commercial Property Management
Comprehensive painting services for property management companies.
Related Case Studies

Wells Fargo Tower
52-story high-rise exterior restoration with LEED certification.

Intel Semiconductor Facility
High-tech manufacturing environment with cleanroom coatings.

Amazon Distribution Center
Industrial coating transformation with food-safe coatings.
Ready to Transform Your Commercial Property?
Get a free consultation and project estimate from our expert team.

