Back to Projects

Historic Downtown Austin Office Building - Heritage Restoration

Client
Lone Star Properties
Location
Austin, Texas
Size
45,000 sq ft
Duration
10 weeks

Services

  • Historic Building Restoration
  • Brick Restoration
  • Window Frame Restoration
  • Decorative Millwork
  • Lead-Safe Practices

Project Overview

The historic downtown Austin office building restoration project demonstrates Moorhouse Coating’s expertise in preserving architectural heritage while creating modern commercial spaces. This 1920s landmark required meticulous restoration using period-appropriate materials and techniques while meeting contemporary building codes and tenant requirements.

Historic Preservation Challenges

Architectural Heritage

The building’s restoration required:

  • Historical paint analysis to determine original color schemes
  • Period-appropriate material selection and application techniques
  • Preservation of decorative architectural elements
  • Compliance with National Register of Historic Places standards
  • Coordination with Austin Historic Preservation Office

Lead-Safe Renovation

As a pre-1978 building, comprehensive lead-safe practices included:

  • EPA RRP certified technician supervision
  • Containment systems protecting surrounding areas
  • HEPA filtration and specialized equipment use
  • Safe work practices protecting workers and public
  • Proper disposal of lead-containing materials

Technical Solutions

Paint Analysis and Color Matching

Historical accuracy required extensive research:

  • Microscopic paint chip analysis revealing original colors
  • Archive research of 1920s architectural color palettes
  • Custom color matching using period-appropriate pigments
  • Sample approval process with preservation authorities
  • Documentation for future reference and maintenance

Specialized Restoration Techniques

Traditional craftsmanship met modern standards:

  • Hand-scraping of decorative millwork preserving detail
  • Brush application techniques matching original textures
  • Multi-coat primer systems ensuring long-term durability
  • Window restoration using traditional glazing compounds
  • Masonry restoration with lime-based mortar systems

Project Execution

Phased Renovation Approach

The complex project required careful sequencing:

  • Phase 1: Exterior envelope and structural elements
  • Phase 2: Common areas and historic lobby restoration
  • Phase 3: Tenant build-out spaces with modern amenities
  • Phase 4: Final details and historical marker installation

Quality Control

Strict standards ensured preservation compliance:

  • Daily documentation with progress photography
  • Regular inspections by preservation consultants
  • Material testing and approval at each phase
  • Coordination with architects and historical societies
  • Final review and approval by preservation authorities

Modern Integration

Contemporary Workplace Features

While preserving historic character, the project incorporated:

  • Modern HVAC integration with minimal visual impact
  • Updated electrical systems hidden within existing casework
  • Technology infrastructure supporting contemporary office needs
  • ADA compliance improvements maintaining historic integrity
  • Energy efficiency upgrades using appropriate materials

Sustainable Practices

Environmental responsibility guided material selection:

  • Low-VOC formulations protecting indoor air quality
  • Restoration rather than replacement reducing waste
  • Energy-efficient window restoration improving performance
  • Local material sourcing supporting regional suppliers
  • Waste reduction through careful planning and execution

Results and Recognition

Preservation Success

The completed restoration achieved:

  • National Register of Historic Places compliance certification
  • Austin Historic Preservation Office commendation
  • Texas Historical Commission recognition
  • 100% tenant occupancy within 6 months of completion
  • Increased property value reflecting quality restoration

Community Impact

The project contributed to downtown Austin revitalization:

  • Preservation of historic architecture for future generations
  • Creation of modern office space supporting local businesses
  • Enhancement of downtown historic district character
  • Support for historic preservation advocacy and awareness

Ongoing Maintenance

Moorhouse Coating continues to support the property through:

  • Annual historic preservation maintenance assessments
  • Touch-up and repair services using historically appropriate materials
  • Consultation on future improvements and modifications
  • Training for building maintenance staff on historic materials
  • Documentation updates for preservation records

Planning a historic renovation project? Contact Moorhouse Coating for expert preservation services that honor your building’s heritage while meeting modern needs.