What cleanroom coating work did Moorhouse Coating complete for a semiconductor manufacturer?
Quick Answer: Moorhouse Coating completed a 500,000 square foot Semiconductor Manufacturer semiconductor facility coating project in Chandler, Arizona. ESD-safe application, HEPA-filtered equipment, non-shedding materials, particle monitoring, and containment procedures supported ISO Class 5 cleanroom requirements across critical production zones.
Semiconductor Facility
Precision clean room coating for critical semiconductor manufacturing environments
Semiconductor Facility: Project Overview
Client
Semiconductor Manufacturer - Semiconductor Manufacturing Division
Location
Chandler, Arizona
Project Scope
Clean room and controlled environment coating application across 500,000 sq ft of semiconductor manufacturing space
Duration
6 months (phased approach)
The Challenge
Semiconductor Manufacturer needed to update the coating systems in their semiconductor fabrication facility without disrupting the 24/7 manufacturing operations. The project required maintaining ISO Class 5 clean room standards while applying specialized ESD-safe coatings in areas with sensitive electronic equipment worth millions of dollars. Similar to our Austin tech campus project, maintaining continuous operations was critical.
The facility's strict contamination control requirements meant zero tolerance for particles, outgassing, or any disruption to the controlled environment. Additionally, all work had to be completed around active semiconductor wafer production.
Project By The Numbers
500K
Square Feet
ISO 5
Clean Room Class
Zero
Contamination Events
24/7
Operational Throughout
Our Solution
Specialized Materials
- • Low-outgassing epoxy systems
- • ESD-safe conductive coatings
- • Particle-free application methods
- • ISO-certified clean room paints
Clean Room Protocols
- • Full bunny suit requirements
- • HEPA-filtered equipment
- • Continuous particle monitoring
- • Multi-stage decontamination
Phased Execution
- • Zone-by-zone approach
- • Coordinated with production
- • Night and weekend work
- • Zero downtime achieved
Clean Room Coating Process
Pre-Qualification
Material testing and particle count verification in controlled environment
Containment Setup
Installation of clean room barriers and negative air systems
Surface Preparation
Particle-free cleaning and preparation methods
Coating Application
Precision application with continuous monitoring
Results & Impact
Performance Metrics
- Maintained ISO Class 5 standards throughout project
- Zero particle contamination events recorded
- 100% ESD compliance verified
- Completed 2 weeks ahead of schedule
Client Benefits
- No production interruption or yield impact
- Extended coating life with 10-year warranty
- Improved facility aesthetics and morale
- Enhanced chemical resistance in process areas
Frequently Asked Questions
What makes clean room painting different from standard industrial painting?
How do you prevent contamination during semiconductor facility painting?
What certifications are required for painting in semiconductor facilities?
Related projects: E-Commerce Distribution Center | Industrial Painting Services | Phoenix Manufacturing Facilities